With the start of the third week of excavation, the level has risen 1234, 1152 and placed under N of 856. Has been discovered an irregular pavement, which extends several parts of the area (uuee 1163, 1174).
has completed the excavation of canals further south, uuee 746 and 748, in which fillers have been found plenty of nails of various sizes, highlighting a large head.
structure located in the west of the industry, following up the recovery levels 857 and 743, have been a number of post holes / trays, as in the mid-southern area of \u200b\u200bthe area by removing the 796 level.