After several days of rain, today we have resumed the field. Burials have been excavated four more (uuee 960, 943, 1244, 1246), while the two latter on the level of pavement located east of the sector, so that the excavation is prior to lifting it.
has begun excavating the east side of 856 (divided by a slot), after finishing with the west, where the level of stones removed, the pavement appeared mentioned in other areas of the excavation.
has also started digging a series of troughs located in the west of the site, intending to identify the stratigraphic relationships between this area, the cemetery and the possibility of having a continuity with the sector opened in 2007.
how are you both 856 cells, have an abundance of stone material, especially slabs of limestone and sandstone blocks, which indicates that we are filling levels / amortization made with material from any possible structure although we have not located.
0 comments:
Post a Comment